Electric Upgrades Completed at 50 Schools

Location: United Kingdom

Scope of works: Electric Upgrades

Sector: Public

Project: Electric upgrades to facilitate green energy solutions

At Connections2energy we have successfully upgraded electric supplies for over 50 schools across the UK to install renewable energy equipment, assisting the Public Sector Decarbonisation Scheme. The PSDS supports the aim of reducing emissions from public sector buildings by 75% by 2037, compared to a 2017 baseline, by switching to renewable energy solutions such as air source heat pumps.

In most cases, these public sector buildings require an electric upgrade for green energy solutions such as air source heat pumps to be installed successfully. Connections2energy has worked diligently to ensure these upgrades are efficiently project-managed. Given the challenges of working within schools, our technical team had a limited window to coordinate the work without disrupting daily operations. These upgrades are essential, assisting schools to adopt green energy solutions as soon as possible.

“It’s been fantastic leading these crucial projects, ensuring public sector buildings have the infrastructure needed for a greener future. With another 50 schools set for upgrades in 2025, we remain committed to supporting net zero plans.”

Andrea Naylor, Business Development Manager

Can we assist you?

Connections2energy understands that coordinating multiple connection providers can be challenging. Let us remove the stress and streamline your process by allowing us to design and deliver your multi-utility requirements through one contact point.

Read more about our multi-utility services here.

The Team

Andrea Naylor
Business Development Manager

SIMILAR PROJECTS

Take a look at some of our similar recent projects. At Connections2energy we understand that no two projects are the same, our main priority is to adapt to client needs and project demands.

119,000 sq. ft Filming Studio In North London

Omega South Mixed-Use Development Completed

229 New Flats In South Yorkshire

Don’t hesitate to contact us whether it’s just for friendly advice, a no-obligation quotation or any other queries you may have

Site Address(Required)
Drop files here or
Max. file size: 50 MB.
    Upload any documents that will help us progress with your project here: Site location plans, site layout plans, meter positions, loadings and fixtures.