Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

New Youth Centre In Newham

Location: Newham, United Kingdom

Scope of works: Full multi-utility including:

Gas Disconnection, Gas Meter Removal, Electric Disconnection, Temporary Builders Supply & New 219kVA Electric Connection

Sector: Commercial

Project: New Youth Centre

Connections2energy are delighted to work alongside this repeat client on their new project, a new youth centre for 9-19 year-olds, in Newham.

Connections2energy will be facilitating the gas and electric disconnections prior to demolition. A new two-storey building will replace the old one, requiring a temporary builders supply followed by a new 219kVA electric connection.

Situated in one of the most economically deprived areas within the borough, the purpose of rebuilding Shipman Youth Zone is to ensure that the council provides safe, warm and welcoming spaces for its young people and their families.

The zero-carbon building will include a range of amenities such as a sports hall, gym, music studio, computer suite and a crafts space.

We look forward to seeing this project completed and opened to the residents of Newham.

Can we assist you?

Connections2energy understands that coordinating multiple connection providers can be challenging. Let us take the stress away and streamline your process by allowing us to design and deliver your multi-utility requirements through one single contact point.

Read more about our multi-utility services here.

“Very friendly and efficient service at a sensible cost.
Would not hesitate to recommend them.”

SIMILAR PROJECTS

Take a look at some of our similar recent projects. At Connections2energy we understand that no two projects are the same, our main priority is to adapt to client needs and project demands.

Omega South Mixed-Use Development Completed

229 New Flats In South Yorkshire

Re-Development of Northamptonshire Farm

Don’t hesitate to contact us whether it’s just for friendly advice, a no-obligation quotation or any other queries you may have

Site Address(Required)
Drop files here or
Max. file size: 50 MB.
    Upload any documents that will help us progress with your project here: Site location plans, site layout plans, meter positions, loadings and fixtures.